Sam’s Branch Greenway / Clayton, NC

Sams Branch_Clayton 2 for web

The Details

This 1.3-mile greenway project connects Legends Park at City Road to the existing Sam’s Branch Greenway Trailhead on O’Neal Street. This is one of three sections that provides a safe bicycle/pedestrian connection from the Neuse River Greenway to downtown Clayton. The trail consists primarily of a 10-foot-wide asphalt trail that includes 270 feet of boardwalk and a 60-foot prefabricated bridge. The project was funded through LAPP which required NCDOT review and coordination. Regulatory agency requirements included natural resources and endangered species investigation, FEMA no-rise certification, and jurisdiction stream determination.

OWNER

Town of Clayton

Footer Widget Area

Add widgets in Appearance → Widgets → Footer Widgets