This project extends the French Broad River Greenway from the French Broad River Park at Amboy Road to the New Belgium Brewing Company. The greenway will be 10 feet wide with both asphalt and concrete surfaces.
Stewart’s services include greenway plans, signing plans, construction management plans and PS&E package.
Due to the terrain and river location, a proposed soldier pile wall will be utilized and we paid close attention to the design in order to obtain a no-rise certification for the project.