NC 7 Improvements (U-3608 / U-5800) / Gaston County, NC

concept

The Details

This project consists of studying improvements to the NC 7 corridor from the US 29/74 intersection north across I-85. Stewart will study new location and improve existing alternatives to determine the preferred alternative to carry to planning document completion. Through these improvements, the capacity and functionality of the corridor will be improved to provide better connectivity and improved safety.

Key design challenges included balancing context sensitive design within a congested corridor.

Owner

NCDOT

Start Date

2015

Completion Date

TBD

Construction Cost

$4.6 M (estimated)